Just Builders is preparing for inspections (electrical, mechanical, plumbing, and structural) in the east addition that are needed before drywall is installed.   New telephone and network cables have been installed which was work done “by owner.”  Thanks to Andy Platt and Tim Sophocles for taking the lead on this task.  The final bricks have been placed on the east addition and on the tower.  Concrete for the main run of the handicap ramp has been poured including an embedded heating system to eliminate snow and ice.